Neighborhood Construction Season 1


Construction in the neighborhood has commenced. There is a multi-year project to improve the storm sewer drainage for our alley. It involves running a 6x6 foot chamber the length of the block and new pipes down to the lake. Before that could happen, we had a new gas main put in last fall, and this spring everyone is getting new lead-free plumbing. The gas main runs under the sidewalk, so there's a section missing in front of each house so the connection could be made. Last fall, the sidewalk was temporarily patched with asphalt. This year, it was dug up and we're waiting for new concrete.

 