The city is going to "fix" our storm sewer so that our alley won't flood any more. It's going to be done in three phases over the next two years. Phase 1: Lake Harriet to 49th St., Phase 2: 49th to 50th, Phase 3 in 2027: 50th and the alley.
The city held an open house for the residents to learn about the project and interact with the city engineer. We voiced our concerns about street access, parking, traffic congestion, and the fact that the entire neighborhood is built atop a pile of beach sand that collapses when excavated. We were assured that everything has been considered and it will work out well.
The detour for the parkway is routed along 49th St., which is a popular alternate route for bicyclists going east-west and avoiding 50th. We voiced concerns about this, too.